summary | shortlog | log | commit | commitdiff | tree
raw | patch | inline | side by side (parent: aa0449e)
raw | patch | inline | side by side (parent: aa0449e)
author | Chase Maupin <chase.maupin@ti.com> | |
Thu, 11 Apr 2013 21:48:16 +0000 (16:48 -0500) | ||
committer | Felipe Balbi <balbi@ti.com> | |
Fri, 12 Apr 2013 07:20:46 +0000 (10:20 +0300) |
* Enhance the product owner role to make clear that the product
owner is trying to maximize bang for buck.
* Added some verbage to introduce the idea of missing merge
windows as technical debt and why upstreaming efforts may get
higher priority within a sprint because of this.
* This will need to be detailed out more. Likely within
chapter 6 where we can discuss the idea of every development
item having a corresponding and immediate upstream item
in the backlog to ensure the technical debt does not exceed
the bandwidth of the team.
Signed-off-by: Chase Maupin <Chase.Maupin@ti.com>
Signed-off-by: Felipe Balbi <balbi@ti.com>
owner is trying to maximize bang for buck.
* Added some verbage to introduce the idea of missing merge
windows as technical debt and why upstreaming efforts may get
higher priority within a sprint because of this.
* This will need to be detailed out more. Likely within
chapter 6 where we can discuss the idea of every development
item having a corresponding and immediate upstream item
in the backlog to ensure the technical debt does not exceed
the bandwidth of the team.
Signed-off-by: Chase Maupin <Chase.Maupin@ti.com>
Signed-off-by: Felipe Balbi <balbi@ti.com>
roles-in-scrum.tex | patch | blob | history |
diff --git a/roles-in-scrum.tex b/roles-in-scrum.tex
index f078b28cbe4b55f3e4d2928b8e790f10f4292620..b2804ffaaac2407f8b4975cdc12e9fdfcdcf79e4 100644 (file)
--- a/roles-in-scrum.tex
+++ b/roles-in-scrum.tex
the Product Backlog is a living entity which can change at any time as long it
doesn't touch the sprint.
+\paragraph{}
+The product owner seeks to maximize the 'bang for buck' by making sure that the
+highest priority backlog items deliver the greatest value for the amount of
+development effort. Within \textit{LCPD} this may entail prioritizing the
+upstreaming of a feature over the development of a new feature because the
+technical debt of missing that window is greater than the value of the new
+feature.
+
\section{The Team}
\label{sec:the-team}