summary | shortlog | log | commit | commitdiff | tree
raw | patch | inline | side by side (parent: 22c5412)
raw | patch | inline | side by side (parent: 22c5412)
author | Felipe Balbi <balbi@ti.com> | |
Mon, 8 Apr 2013 12:10:37 +0000 (15:10 +0300) | ||
committer | Felipe Balbi <balbi@ti.com> | |
Mon, 8 Apr 2013 12:10:37 +0000 (15:10 +0300) |
Signed-off-by: Felipe Balbi <balbi@ti.com>
estimating.tex | [new file with mode: 0644] | patch | blob |
introduction.tex | patch | blob | history | |
ti-agile-methodology-manual.tex | patch | blob | history |
diff --git a/estimating.tex b/estimating.tex
--- /dev/null
+++ b/estimating.tex
@@ -0,0 +1,19 @@
+%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
+%% %%
+%% Copyright (C) 2013 Texas Instruments Incorporated - http://www.ti.com %%
+%% %%
+%% Author: Felipe Balbi <balbi@ti.com> %%
+%% %%
+%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
+
+\chapter{Estimating}
+\label{chap:estimating}
+
+\section{Tasks Are Broken, Now What ?}
+\label{sec:tasks-are-broken-now-what}
+
+\section{Estimated Task Is Too Large To Fit In One Sprint}
+\label{sec:estimated-task-is-too-large}
+
+\section{Implementing, At Last}
+\label{sec:implementing-at-last}
diff --git a/introduction.tex b/introduction.tex
index 11fc538ed612143298bce75bbf28cad9efb9aeb3..022b71a9ec0560bbe50ce32382283bec1f7755bb 100644 (file)
--- a/introduction.tex
+++ b/introduction.tex
understand how to break e.g. \textit{Development of QSPI driver} into smaller,
bite-sized pieces which can done in the course of one sprint.
+\paragraph{}
+After being able to break tasks into small pieces, we need to come up with
+proper estimates (in hours) in order to have an idea of how long a certain task
+will take in order to be completed. Such discussion is left for chapter
+\ref{chap:estimating} and will be as thorough as possible while analyzing a
+ficticious scenario.
+
\paragraph{}
Lastly, chapter \ref{chap:definition-of-done} will put forth our
\textit{Definition of Done} which will be used by all scrum teams. A global
index 3df409aa09ef011d0c3407ef1a83ed2b3a21f274..c00a5de5a0b96e4356c9a4bae895a4977b3a1164 100644 (file)
\input{roles-in-scrum.tex}
\input{the-sprint.tex}
\input{breaking-tasks-up.tex}
+\input{estimating.tex}
\input{definition-of-done.tex}
\nocite{*}