summary | shortlog | log | commit | commitdiff | tree
raw | patch | inline | side by side (parent: 414d9bc)
raw | patch | inline | side by side (parent: 414d9bc)
author | Felipe Balbi <balbi@ti.com> | |
Mon, 8 Apr 2013 11:45:13 +0000 (14:45 +0300) | ||
committer | Felipe Balbi <balbi@ti.com> | |
Mon, 8 Apr 2013 11:55:10 +0000 (14:55 +0300) |
Signed-off-by: Felipe Balbi <balbi@ti.com>
roles-in-scrum.tex | patch | blob | history |
diff --git a/roles-in-scrum.tex b/roles-in-scrum.tex
index 5b11820debf83bad893d3eb792427d270b0cc432..549f8067047de68b53c8f75b04833be61ebf1166 100644 (file)
--- a/roles-in-scrum.tex
+++ b/roles-in-scrum.tex
doesn't touch the sprint.
\section{The Team}
+\label{sec:the-team}
+
+\paragraph{}
+Composed of everyone doing actual engineering work, the Scrum team is
+responsible for estimating and delivering implementations.
+
+\paragraph{}
+Whenever a roadblock shows up, the team is required to notify their ScrumMaster
+about the issues so it can be solved at the earliest possibility.